AGOCO Intelligence Lens
Verified public-source intelligence for AGOCO, focused on production, wells, refining, pipelines, projects and asset-integrity public signals. Internal operating status is not inferred from public evidence.
What changed and what matters
Source-linked public evidence, with historical, target and current-review semantics kept distinct.
Arabian Gulf Oil Company re-publishes qualifying advertisement PQC-09/2026
AGOCO operations
AGOCO opened prequalification for Project R-79 covering disposal and injection of produced water, with submissions closing 27 October 2026.
Open source evidence →Production Increase Plan Monitoring Committee Conducts Field Visit to AGOCO Fields
Sarir / Messla / Nafoora / Contract Area 91
NOC inspected AGOCO fields and reported technical, administrative and financial obstacles slowing approved production-increase projects, with priority on production sustainability and output growth.
Open source evidence →AGOCO Boosts Production at Well B1-NC2 Thirteenfold Using Natural Flow
NC2 concession
NOC reported AGOCO increased B1-NC2 production from about 300 to approximately 4,000 barrels per day using natural flow without artificial lift.
Open source evidence →New well Z-13 boosts Gulf Oil’s Al-Bayda yield by 488 barrels per day
Al-Bayda field
AGOCO started Z-13 operations and NOC reported initial testing at 488 barrels of crude oil per day after tie-in to the Al-Dur station.
Open source evidence →Sarir Field Gains Momentum as L-028HR Well Rejoins Production Line
Sarir field
AGOCO returned L-028HR to production after a technical development program; NOC reported capability of 2,200 barrels of crude oil per day.
Open source evidence →Sarir Refinery Back to Full Capacity After Major Overhaul
Sarir Refinery
AGOCO completed the Sarir Refinery crude-distillation-unit major overhaul and NOC reported the refinery had returned to full operations after technical testing.
Open source evidence →Constraints and operating attention
NOC inspected AGOCO fields and reported technical, administrative and financial obstacles slowing approved production-increase projects, with priority on production sustainability and output growth.
AGOCO completed the Sarir Refinery crude-distillation-unit major overhaul and NOC reported the refinery had returned to full operations after technical testing.
Projects, targets and development
AGOCO opened prequalification for Project R-79 covering disposal and injection of produced water, with submissions closing 27 October 2026.
NOC inspected AGOCO fields and reported technical, administrative and financial obstacles slowing approved production-increase projects, with priority on production sustainability and output growth.
AGOCO started Z-13 operations and NOC reported initial testing at 488 barrels of crude oil per day after tie-in to the Al-Dur station.
AGOCO returned L-028HR to production after a technical development program; NOC reported capability of 2,200 barrels of crude oil per day.
AGOCO completed the Sarir Refinery crude-distillation-unit major overhaul and NOC reported the refinery had returned to full operations after technical testing.
View all 6 verified evidence records
| Scope | Date | Topic | Metric / signal | Status | Source |
|---|---|---|---|---|---|
| AGOCO | 13 Oct 2026 | Water Management / Procurement / Environment | Produced-water disposal and injection project prequalification | 2026 signal | Evidence |
| AGOCO | 25 Sep 2026 | Production / Projects / Reliability / Oversight | Production-increase project obstacles | 2026 signal | Evidence |
| AGOCO | 11 Jun 2026 | Production / Well Optimization | B1-NC2 oil production after intervention | Historical point in time | Evidence |
| AGOCO | 06 Mar 2026 | Production / Well Development | Z-13 initial oil production | Historical point in time | Evidence |
| AGOCO | 04 Feb 2026 | Production / Well Development | L-028HR oil production | Historical point in time | Evidence |
| AGOCO | 04 Feb 2026 | Refining / Reliability / Maintenance | Sarir refinery crude distillation unit overhaul and restart | Historical point in time | Evidence |
Public-source intelligence only. Independent analysis; no confidential company data or endorsement is implied. Data boundaries.