What changed and what matters
Source-linked public evidence, with historical, target and current-review semantics kept distinct.
Production Increase Plan Committee Continues Field Tours and Visits to Waha and Harouge Oil Fields
Jalu 59 / Waha / Defa / Alfaragh / Dahra fields
NOC’s Production Increase Plan Committee inspected Waha-operated fields, reviewing facilities, critical infrastructure, key projects and technical, administrative and financial challenges.
Open source evidence →NOC inaugurates an advanced crude-oil flow measurement system at the Sidra oil terminal, operated by Waha Oil Company
Sidra oil terminal
NOC inaugurated a new crude-oil flow measurement system at Waha-operated Sidra terminal with two metering skids, each fitted with four ultrasonic flow meters and master-meter calibration capability.
Open source evidence →NOC Reviews Waha Oil Company’s Financial and Operational Plans
Waha operations
NOC reported Waha production stable at 357,000 barrels per day during its August 2026 technical and financial review.
Waha’s 2026 plan targets adding 42,000 barrels per day through development drilling and maintenance of shut-in wells.
Open source evidence →Constraints and operating attention
NOC’s Waha review identified pipeline leaks as an engineering challenge and discussed financial obligations affecting contractors, with emphasis on securing funding.
Projects, targets and development
NOC’s Production Increase Plan Committee inspected Waha-operated fields, reviewing facilities, critical infrastructure, key projects and technical, administrative and financial challenges.
NOC inaugurated a new crude-oil flow measurement system at Waha-operated Sidra terminal with two metering skids, each fitted with four ultrasonic flow meters and master-meter calibration capability.
Waha’s 2026 plan targets adding 42,000 barrels per day through development drilling and maintenance of shut-in wells.
NOC reported a Waha drilling program of 29 wells: 20 vertical, 5 horizontal and 4 water-injection wells.
View all 7 verified evidence records
| Scope | Date | Topic | Metric / signal | Status | Source |
|---|---|---|---|---|---|
| WAHA | 26 Sep 2026 | Production / Projects / Oversight | Production-increase plan field oversight | 2026 signal | Evidence |
| WAHA | 25 Aug 2026 | Export / Measurement / Infrastructure | Sidra export fiscal metering system | 2026 signal | Evidence |
| WAHA | 12 Aug 2026 | Production | Waha oil production | 2026 review | Evidence |
| WAHA | 12 Aug 2026 | Strategy / Targets | 2026 incremental production target | Active target | Evidence |
| WAHA | 12 Aug 2026 | Production Performance | Incremental production achieved against 2026 plan | Historical point in time | Evidence |
| WAHA | 12 Aug 2026 | Drilling / Development | 2026 drilling program wells | 2026 review | Evidence |
| WAHA | 12 Aug 2026 | Operational Risk / Reliability | Pipeline leaks and funding constraints | 2026 signal | Evidence |