LIFECO Intelligence Lens
Verified public-source intelligence for LIFECO, focused on production, reliability, maintenance, exports, HSE and governance public signals. Internal operating status is not inferred from public evidence.
What changed and what matters
Source-linked public evidence, with historical, target and current-review semantics kept distinct.
Urea II exceeds 103% of March production target
Urea operations · Urea product dispatch / export · Ammonia product dispatch / export · Urea II
LIFECO reported 46,537 metric tonnes of urea production during March 2026.
LIFECO reported 36,709 metric tonnes of urea exports during March 2026.
Open source evidence →Libyan Fertilizer Company Convenes General Assembly
Ammonia and urea plants
LIA reported improved operational performance in LIFECO’s ammonia and urea plants while also noting principal challenges and difficulties.
Open source evidence →Second phase of SG-1011 B boiler replacement at Urea I
Urea I / SG-1011 B
LIFECO reported the second phase of replacing the SG-1011 B boiler at Urea I, including transport of the 160-ton replacement unit.
Open source evidence →LIFECO and Jowfe discuss safe disposal of stagnant chemicals
LIFECO operations
LIFECO and Jowfe discussed mechanisms and a strategic work approach for safe disposal of stagnant chemical materials.
Open source evidence →Catalyst replacement in Ammonia I primary reformer
Ammonia I primary reformer
LIFECO reported catalyst removal/replacement and tube inspection work on the Ammonia I primary reformer, planned for about 15 days.
Open source evidence →Constraints and operating attention
LIFECO reported the second phase of replacing the SG-1011 B boiler at Urea I, including transport of the 160-ton replacement unit.
LIFECO and Jowfe discussed mechanisms and a strategic work approach for safe disposal of stagnant chemical materials.
LIFECO reported catalyst removal/replacement and tube inspection work on the Ammonia I primary reformer, planned for about 15 days.
Projects, targets and development
LIFECO reported the second phase of replacing the SG-1011 B boiler at Urea I, including transport of the 160-ton replacement unit.
LIFECO reported catalyst removal/replacement and tube inspection work on the Ammonia I primary reformer, planned for about 15 days.
View all 8 verified evidence records
| Scope | Date | Topic | Metric / signal | Status | Source |
|---|---|---|---|---|---|
| LIFECO | 25 Apr 2026 | Production / Urea | Urea production | Historical point in time | Evidence |
| LIFECO | 25 Apr 2026 | Exports / Urea | Urea exports | Historical point in time | Evidence |
| LIFECO | 25 Apr 2026 | Exports / Ammonia | Ammonia exports | Historical point in time | Evidence |
| LIFECO | 25 Apr 2026 | Production Performance / Urea II | Urea II March target attainment | Historical point in time | Evidence |
| LIFECO | 08 Oct 2025 | Governance / Operational Performance | Ammonia and urea operational-performance review | Historical point in time | Evidence |
| LIFECO | 21 Sep 2025 | Maintenance / Critical Assets | Urea I SG-1011 B boiler replacement | Historical point in time | Evidence |
| LIFECO | 30 Jul 2025 | HSE / Environment / Materials | Safe disposal planning for stagnant chemicals | Historical point in time | Evidence |
| LIFECO | 21 Jan 2025 | Maintenance / Reliability / Ammonia I | Ammonia I primary-reformer catalyst replacement | Historical point in time | Evidence |